Sabena technics has signed a deal with Air Tahiti Nui to perform heavy maintenance checks on two of the airline’s Airbus A340s. The checks will be carried out in Sabena technics facilities in Bordeaux (France), starting in November 2014. Gerard Maurin, Vice-President Operation of Air Tahiti Nui, said: “After a request for proposal, Air Tahiti Nui is determined to entrust Sabena technics with the next two C checks of its fleet, keeping in mind the conservation of the high technical level required for this heavy maintenance operation. Several criteria guided our choice: the performance on the previous C check, the

This content is restricted to site members.

If you are an existing user, please login below.
New users may register below.

Existing Users Log In